Permits & Rates
For information concerning Sewer, Water Permits and Inspections, please contact:
Permit/Project Coordinator II
John Evans
330-298-2066 (Direct Phone)
Email
For project application and permit submittal by property owners, architects, and engineers use the email submittal link below:
pcwr.permits@portageco.com
For project construction drawing submittal by property owners, architects, and engineers use the email submittal link below:
pcwr.plans@portageco.com
Permits shall be pulled for the following reasons:
- New sewer/water laterals (Residential or Commercial)
- Disconnect or Reconnect sewer/water laterals for buildings (stops billing on an account)
- Change of Owner/Use on existing connection - (Commercial Use only)
- Repairs of laterals on outside of buildings for sewer/water
- Grease Interceptor installation/repair
- Seasonal Hydrant Meter Usage for construction and temporary use (during non-winter months only)
All permits pulled shall have inspection by the Water Resources Department within a specified time limit, see expiration dates on permits.
Residential Accounts shall call the billing office 330-297-3672 to switch the sewer/water account into their name or to schedule any final meter reads of an address. No permit is required.
Maps
User Rates & Tap-in Fees
Permit Forms
- Application for Sewer and Water Permit
- Supplemental-Commercial-Industrial-Sewer Application for Sewer Permit
Residential Forms
- Application for Seasonal Water Service Shut Off-Turn On
- Discount Program Application Form
- Direct Debit Payment Program
- Sewer Connection Charge Deferred Payment Request
- Water Connection Charge Deferred Payment Request
Commercial & Restaurant Forms
- Industrial Pre-treatment Program Short Form
- Industrial Pre-treatment Program Long Form
- Industrial Pre-treatment Fog Disclosure Form
- Fats, Oil & Grease (FOG)
- What is FOG (Fats, Oils, and Grease)?
- Grease Trap / Interceptor Cleaning Log
- Oil/Water Separator CLEANING LOG